News Flash

Spotlight

Posted on: September 20, 2021

Groundwater Study in Hamlet of Exshaw

On Tuesday, September 14th MD Council awarded the contract for the Exshaw groundwater study to Matrix Solutions Inc.  

The following scope of work will be conducted for the Groundwater Study:

  • Data compilation, data gap analysis and development of a preliminary conceptual site model (CSM)
  • Field program for data collection program and refinement of the CSM
  • Preparation of an integrated surface water / groundwater model
  • Reporting and presentation to Administration and Council

The noted data compilation will entail eight months of data collection which includes the 2022 freshet. 

At the conclusion of the data collection, Matrix will provide a summary of data collected, any data gaps and a preliminary CSM.  The outcome of the summary will provide direction to the next steps in the scope of work.

Matrix Solutions Inc.- Proposed Groundwater Study in the Hamlet of Exshaw


Facebook Twitter Email

Other News in Spotlight

FireSmart 101

Posted on: April 30, 2021

Jura Creek Flood Mitigation Project

Posted on: August 16, 2021

COVID-19 Resources and Helpful Links

Posted on: December 18, 2020