A minimum five business days notice is required to schedule inspections, water meter installations and curb stop activations/deactivations.
A Water Meter Work Order is required before the Municipality will supply or install a water meter.
A Service Connection Agreement is required for the construction or modification of any portion of a water, wastewater or stormwater service which connects to a piped municipal system. A Temporary Use of Roads/Municipal Lands Permit is additionally required for any work undertaken within municipal lands. All work shall be developed in accordance with the Standards for Site Servicing.